IAI
Designed for ELTA LTD. Aran was tasked to provide a field ready Communication system based on an ELTA’s demonstrator. ARAN addressed the Industrial design, MMI, power and control, mechanical design as well as the manufacturing and testing.
Time schedule for the project was challenging. First article was presented for testing in under 4 months.